基于降低电流负载法的双馈风力发电机温升试验研究

Research on the Application of Current Load Reduction Method to Temperature Rise Test of Doubly-fed Wind Turbine

  • 摘要: 本研究运用降低电流负载的方法对3.4MW双馈型风力发电机进行了温升试验,结果表明降低电流负载法得到的电机温升值与全功率试验下的电机温升值吻合度较高,误差仅为1K左右。该方法可在容量较小的试验站试验较大功率电机的情况下使用,对电机试验设备能力不足或不具备全功率试验条件的情况下做温升试验有重要实践指导意义。

     

    Abstract: The temperature rise test of 3.4MW double-fed wind turbine is carried out by reducing the current load method.The results show that the motor temperature rise obtained by reducing the current load method is in good agreement with the motor temperature rise under the full power test, and the error is only about 1K.This method can be used in the test station with small capacity to test the high power motor, and has important practical significance for the motor test equipment with insufficient capacity or without full power test conditions.

     

/